BORABELA s.r.o. — Steel structures, CNC production, CE certification

CNC precision. BIM coordination. EN 1090 certification.

Every BORABELA structure is produced on Howick CNC lines, modelled in Vertex BD and delivered with a CE declaration of performance.

Technology at a glance

Howick CNC — ±0.1 mm

Input coil of S320GD+Z275 galvanised steel supplied by Wuppermann. The profile is formed into a C or U shape, cut to length and inkjet-labelled according to the assembly documentation. A 12 m profile is produced in 1 minute.

Vertex BD — BIM workflow

Parametric model with IFC, DWG, 3D PDF and Revit-compatible outputs. Direct CNC export to the Howick line without manual re-entry of data.

EN 1090 — CE certification

Certificate of conformity of factory production control to EN 1090 up to execution class EXC2. For every order we issue a Declaration of Performance (DoP) and apply the CE marking.

S320 GD+Z275 steel

Galvanised steel 1.2–1.6 mm thick. C-profiles 100 or 150 mm deep, bracing strap 70×1.2 mm for diagonal stiffening.

Visualisation of the LGSF steel frame of a family house
LGSF frame of a family house — visualisation

Production and design

Howick CNC production

Howick Ltd. machines are the industry standard for LGSF production with over 30 years of tradition. The input coil of S320 GD+Z275 galvanised steel comes from the Austrian supplier Wuppermann. The sheet is formed into a C or U shape, cut to exact lengths and inkjet-labelled according to the assembly documentation. No cutting on site, no improvisation.

  • Material: S320GD+Z275 galvanised steel
  • Thickness: 1.2–1.6 mm
  • Precision: ±0.1 mm
  • Production capacity: frame of a 120 m² house in 3 days
  • Assembly capacity: frame of a 120 m² house in 5–7 working days
  • Labelling: every profile printed according to the assembly documentation

Profiles arrive on site labelled and ready for assembly: the assembly crew does not need to modify anything, just screw the parts together.

Vertex BD — BIM coordination

IFC, DWG, 3D PDF and Revit-compatible output formats in one workflow, without duplicate modelling and manual re-entry of data.

  • Parametric model: every change in the project is automatically carried over to the production documentation
  • CNC export: direct output from Vertex BD to the Howick CNC line, eliminating manual data-entry errors
  • Clash detection: BIM coordination with HVAC, electrical and the existing structure before production
LGSF production diagram: steel coil, Howick CNC line, BIM model and finished panel
From coil to panel: BIM model → Howick CNC line → finished panel

Certification, material and assembly

EN 1090 — CE certification

BORABELA holds a certificate of conformity of factory production control to EN 1090 up to execution class EXC2, scope: production of prefabricated steel parts, components, assemblies and structures from light gauge galvanised profiles.

  • EN 1090-1+A1 (CE marking)
  • EN 1090-2+A1 (execution of steel structures)
  • Execution class EXC2
  • CE marking of every delivery
  • DoP (Declaration of Performance)
  • Conformity with EN 1090

Profiles and assemblies

C-profile: load-bearing and non-load-bearing wall studs, joists of lightly loaded floors. Depth 100 or 150 mm, thickness 1.2–1.6 mm.

U-profile: base, top and guide tracks, complementary to the C-profiles.

Bracing strap: diagonal stiffening transferring tensile forces, cross-section 70×1.2 mm.

  • External wall: C100 + mineral insulation + ETICS 180 mm — U = 0.14 W/m²K, passive standard
  • Floor: truss joist + OSB deck + plasterboard ceiling — Rw 58 dB, REI 60
  • Roof: truss + thermal insulation + breather membrane — U = 0.12 W/m²K, passive standard

Assembly and logistics

Panels are assembled from individual profiles: every panel has its drawing, the labelled profiles fit together easily and are screwed. A 120 m² family house: from unloading the truck to a finished frame in 5–7 working days.

One type of SFS self-drilling screw for the whole structure. No special tools. Erecting the frame needs no crane for buildings up to two storeys; a crane is used only to unload the truck.

The frame weight depends on the specific house: e.g. the Břevnov house (121 m²) has a complete frame weighing about 5.5 tonnes and fits on one truck. Unloading on site with a crane takes about 1 hour.

Production in action

BORABELA profile production: our own CNC line in Jeníkovice
Howick Frame Machine: CNC production technology