Two-storey roof extension of an office building in Prague-Kobylisy

roof extension Prague – Kobylisy, Czech Republic 2016
2016
Completed
2
Storeys
50 working days
Assembly time

Two-storey roof extension of an office building in Prague-Kobylisy

Two new storeys (third and fourth above-ground levels) of an office building built with the BORABELA LGSF light steel structure directly above the occupied building. Frame assembled in 50 working days without interrupting operations.

Location
Prague – Kobylisy, Czech Republic
Structure type
roof extension
Completed
2016
Storeys
2
Material
S320 GD+Z275

Two-storey roof extension (third and fourth above-ground levels) of an office building in Prague – Kobylisy, built with the BORABELA LGSF light steel structure directly above the building in operation. The frame was assembled in 50 working days without interrupting operations on the lower floors.