The original driveway was turned into a fully usable covered space with maximum use of the area thanks to the LGSF system (light gauge steel structures).
Light steel brings high strength with minimum weight, precise prefabrication and fast construction without unnecessary wet processes. The assembly took 24 hours in total, i.e. 3 working days. The result is an efficient, variable and reliable long-term solution for modern construction projects.
LGSF: when speed, precision and smart use of space matter.




