BORABELA s.r.o. — Steel structures, CNC production, CE certification

LGSF roof structure over a driveway in Prague

roof structure Prague, Czech Republic 2026
90 m²
Built-up area
2026
Completed
3 days
Assembly time

LGSF roof structure over a driveway in Prague

The load-bearing part consists of light gauge steel trusses designed for optimised statics, low weight and high load capacity. The light steel system allows large spans without massive elements, ideal for roofs, mezzanines in halls and parking structures.

Location
Prague, Czech Republic
Structure type
roof structure
Completed
2026
Area
90 m²
Material
S320 GD+Z275

The original driveway was turned into a fully usable covered space with maximum use of the area thanks to the LGSF system (light gauge steel structures).

Light steel brings high strength with minimum weight, precise prefabrication and fast construction without unnecessary wet processes. The assembly took 24 hours in total, i.e. 3 working days. The result is an efficient, variable and reliable long-term solution for modern construction projects.

LGSF: when speed, precision and smart use of space matter.

Call Request a quote →